Frameworx Agreement:
Planned Maintenance
Contract details
Reference:
NPC2001
Duration:
48 months
Estimated total value excluding VAT:
£850,000,000
Main CPV code:
45400000 – Building completion work
Framework Live:
24 January 2023
Workstream #5 Live: 01 March 2023
Framework Workstreams
There are two frameworks for Planned Maintenance, one for Direct Award and one for Mini-Competition. Each of the frameworks is broken down into 6 workstreams:
1A & 1B
Planned Maintenance: External and Communal Works
Undertaking of Planned Maintenance to External and Communal areas of dwellings and corporate, commercial or communal buildings including but not limited to Renewal and/or upgrading of pitched and flat roofs; fascias, cladding and rainwater goods; structural works; windows and/or external and communal doors; communal areas, staircase blocks, access lobbies etc., fencing; roads, paving and other hard surfacing; street furniture; drainage and sewage; and Cyclical Redecoration and pre-decoration repairs
2A & 2B
Planned Maintenance: Internal Works
Undertaking of Planned Maintenance to Internal of dwellings including but not limited to Design, Supply, Renewal and/or upgrading of kitchens; bathrooms; central heating and upgrading of boilers; electric Heating Installations; electrical rewiring; and Other planned Maintenance Works
3A & 3B
Planned Maintenance: External, Communal and Internal Works
Undertaking of Planned Maintenance to dwellings and corporate, commercial or communal buildings including but not limited to Design, Supply, Renewal and/or upgrading of kitchens; bathrooms; central heating and upgrading of boilers; electric Heating Installations; electrical rewiring; pitched and flat roofs; fascias, cladding and rainwater goods; structural works; windows and/or external and communal doors; communal areas, staircase blocks, access lobbies etc., fencing; roads, paving and other hard surfacing; street furniture; drainage and sewage; and Cyclical Redecoration and pre-decoration repairs
4A & 4B
Cyclical Redecoration and Pre-Decoration Repairs
Undertaking of Cyclical Redecoration to external fenestration, facades internal communal areas, staircase blocks, access lobbies, communal facilities and the like, Undertaking Pre-Decoration Repairs (including renewals as necessary) to fascias, cladding and rainwater goods including renewals as necessary; structures; to windows and/or external and communal doors; Repairs to fencing and gates Upgrading of communal areas, staircase blocks, access lobbies etc.,
5A & 5B
Net Zero Carbon Works
Undertaking of Net Zero Carbon Works: including but are not limited to: the Installation of Green Roofs; External Wall Treatments, Internal Wall, Ceiling and Floor Treatments; Triple Glazed Windows and External Doors; High efficiency Boilers; Hydronic Underfloor Heating; Air Source Heat Pumps; Solar Hot Water Panels and Cylinders; MVHR’s; Electrical power generation systems – Wind Turbines and PV panels; energy and sustainability saving plumbing and electrical devices; and other Works in association with Retrofit Works
6A & 6B
Passive Fire Safety Works
Undertaking of Passive Fire Safety Works: including but are not limited to: the Installation of Internal Wall Treatments; Fire Resistant Partitions; Ceiling Fire Protection Treatments; Installation of Fire Barriers, Pipe, Duct and Conduit Sleeves; Firestopping; Fire Check Doors; Fire Escape Windows; Upgrading of meter cupboards, ducting etc; Application of fire upgrading and fire retardant coatings to surfaces; Repairs and inspections of fire check doors; Redecoration following Fire Safety Works; Clearance of unauthorised storage in communal areas; and other Works in association with Fire Safety Works
Awarded Providers
Providers for the Net Zero Carbon Works frameworks (Workstream 5) are now available as of 01/03/2023.
Contractor | Regions | 1 | 2 | 3 | 4 | 5 | 6 |
---|---|---|---|---|---|---|---|
AD Construction Group
(Architectural Decorators Ltd) |
UKH UKI UKJ | ✓ | ✓ | ✓ | ✓ | ✓ | |
Bell Decorating Group Ltd | UKC UKD UKE UKF UKG UKH UKI UKJ UKK UKL UKM UKN | ✓ | ✓ | ✓ | ✓ | ✓ | |
CLC Contractors Limited | UKC UKD UKE UKF UKG UKH UKI UKJ UKK UKL UKM | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
CTS | UKN | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Checkmate Fire Solutions Ltd | UKC UKD UKE UKF UKG UKH UKI UKJ UKK UKL UKM | ✓ | |||||
Chigwell London Ltd | UKH UKI UKJ | ✓ | |||||
Diamond Fire Safety Limited
a division of Diamond Build Group PLC |
UKI UKJ | ✓ | |||||
Guildmore Ltd | UKH UKI UKJ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Harmony Fire Ltd | UKC UKD UKE UKF UKG UKH UKI UKJ UKK UKL UKM UKN | ✓ | |||||
Ian Williams Limited | UKC UKD UKE UKF UKG UKH UKI UKJ UKK UKL | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
LCB Group | UKI UKJ UKK UKL | ✓ | ✓ | ✓ | ✓ | ||
MD Building Services Limited
T/A MD Group |
UKK | ✓ | ✓ | ✓ | ✓ | ✓ | |
Michael Donaghy (P&D) Ltd | UKN | ✓ | ✓ | ||||
Milestone Contracting Limited | UKH UKI UKJ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Novus Property Solutions Limited | UKC UKD UKE UKF UKG UKH UKI UKJ UKK UKL UKM | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
PK Murphy Construction Limited | UKN | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Passive Fire Safety Solutions | UKJ UKK | ✓ | |||||
Pilon Ltd | UKH UKI UKJ | ✓ | |||||
Purdy Contracts Ltd | UKH UKI UKJ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Saltash Enterprises Ltd | UKI | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
TSG Building Services plc | UKH UKI UKJ | ✓ | ✓ | ||||
The LE Group LLP | UKC UKD UKE UKF UKG UKH UKI UKJ UKK UKL UKM UKN | ✓ | |||||
Trail Group Ltd | UKG UKI UKJ | ✓ | |||||
United Living (South) Limited | UKD UKE UKF UKG UKH UKI UKJ UKK | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Ventro Ltd | UKC UKD UKE UKF UKG UKH UKI UKJ UKK UKL UKM UKN | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Vinci Construction UK Ltd
T/A Vinci Facilities |
UKD UKF UKG UKH UKI UKJ UKK UKL | ✓ | ✓ | ✓ | ✓ | ||
Wates Property Services Limited | UKC UKD UKE UKF UKG UKH UKI UKJ UKK UKL | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Contractor
Regions
UKH
UKI
UKJ
Workstreams
1A & 1B
3A & 3B
4A & 4B
5A & 5B
6A & 6B
Contractor
Regions
UKC
UKD
UKE
UKF
UKG
UKH
UKI
UKJ
UKK
UKL
UKM
UKN
Workstreams
1A & 1B
2A & 2B
3A & 3B
4A & 4B
6A & 6B
Contractor
Regions
UKC
UKD
UKE
UKF
UKG
UKH
UKI
UKJ
UKK
UKL
UKM
Workstreams
1A & 1B
2A & 2B
3A & 3B
4A & 4B
5A & 5B
6A & 6B
Contractor
Regions
UKC
UKD
UKE
UKF
UKG
UKH
UKI
UKJ
UKK
UKL
UKM
Workstreams
6A & 6B
Contractor
Regions
UKH
UKI
UKJ
Workstreams
1A & 1B
2A & 2B
3A & 3B
4A & 4B
5A & 5B
6A & 6B
Contractor
Regions
UKC
UKD
UKE
UKF
UKG
UKH
UKI
UKJ
UKK
UKL
UKM
UKN
Workstreams
6A & 6B
Contractor
Regions
UKC
UKD
UKE
UKF
UKG
UKH
UKI
UKJ
UKK
UKL
Workstreams
1A & 1B
2A & 2B
3A & 3B
4A & 4B
5A & 5B
6A & 6B
Contractor
Regions
UKK
Workstreams
1A & 1B
2A & 2B
3A & 3B
5A & 5B
6A & 6B
Contractor
Regions
UKH
UKI
UKJ
Workstreams
1A & 1B
2A & 2B
3A & 3B
4A & 4B
5A & 5B
6A & 6B
Contractor
Regions
UKC
UKD
UKE
UKF
UKG
UKH
UKI
UKJ
UKK
UKL
UKM
Workstreams
1A & 1B
2A & 2B
3A & 3B
4A & 4B
5A & 5B
6A & 6B
Contractor
Regions
UKN
Workstreams
1A & 1B
2A & 2B
3A & 3B
4A & 4B
5A & 5B
6A & 6B
Contractor
Regions
UKH
UKI
UKJ
Workstreams
1A & 1B
2A & 2B
3A & 3B
4A & 4B
5A & 5B
6A & 6B
Contractor
Regions
UKI
Workstreams
1A & 1B
2A & 2B
3A & 3B
4A & 4B
5A & 5B
6A & 6B
Contractor
Regions
UKC
UKD
UKE
UKF
UKG
UKH
UKI
UKJ
UKK
UKL
UKM
UKN
Workstreams
6A & 6B
Contractor
Regions
UKD
UKE
UKF
UKG
UKH
UKI
UKJ
UKK
Workstreams
1A & 1B
2A & 2B
3A & 3B
4A & 4B
5A & 5B
6A & 6B
Contractor
Regions
UKC
UKD
UKE
UKF
UKG
UKH
UKI
UKJ
UKK
UKL
UKM
UKN
Workstreams
1A & 1B
2A & 2B
3A & 3B
4A & 4B
5A & 5B
6A & 6B
Contractor
Regions
UKD
UKF
UKG
UKH
UKI
UKJ
UKK
UKL
Workstreams
1A & 1B
2A & 2B
3A & 3B
5A & 5B
Contractor
Regions
UKC
UKD
UKE
UKF
UKG
UKH
UKI
UKJ
UKK
UKL
Workstreams
1A & 1B
2A & 2B
3A & 3B
4A & 4B
5A & 5B
6A & 6B